10 Ways To Ensure That You Are Being Authentic
Manage episode 414752646 series 3267403
1 Corinthians 15:10
"But by the grace of God, I am what I am, and His grace toward me was not in vain. On the contrary, I worked harder than any of them, though it was not I but the grace of God that is with me"
282 episodios